Name |
Features |
| 1 |
Series |
LU-RPX-420-D |
| 2 |
Trade mark |
MEGA POWER |
| 3 |
Type |
Single pass |
| 4 |
Series |
JP |
| 5 |
Developer |
USA and Israel |
| 6 |
Year of development |
2007 |
| 7 |
Made in China |
Codesign |
| 8 |
Productivity (1 plant) |
1300 kg/hr |
| 9 |
extracts as follows |
|
| 10 |
Metal cord |
240 kg/hr |
| 11 |
Textile cord |
60 kg/hr |
| 12 |
Powder (less than 0.5mm) |
500 kg/hr |
| 13 |
Large fraction (more than 0.5 mm) |
500 kg/hr |
| 14 |
Productivity. Rubber crumb/22 hrs |
22000 kg. (22 tons) |
| 15 |
Productivity. Rubber crumb/year |
6600 tons |
| 16 |
Total power |
115 kW |
| 17 |
Average energy consumption |
85 kW |
| 18 |
Main engine |
46 kW |
| 19 |
Auxiliary engine of the 2nd axis |
25 kW |
| 20 |
Auxiliary engine of the 3 rd engine |
25 kW |
| 21 |
Water and circulation pump |
1 kW |
| 22 |
Dust extractor's pump 3 units. |
3 х 2 kW = 6 kW |
| 23 |
Engine of the separating machine |
4 kW |
| 24 |
Engine of the magnetic separator |
2 kW |
| 25 |
Internal conveying system |
2 х 3 kW =6 kW |
| 26 |
Magnetic separator |
on permanent magnets |
| 27 |
Cooling |
water, compulsory |
| 28 |
Water consumption/hr |
12-14l \ hr |
| 29 |
Water consumption cycle |
Closed |
| 30 |
Operating temperature |
90-95 C |
| 31 |
Emergency stop temperature |
175-180 С |
| 32 |
Recycles workpieces |
1000 х1000 х750 mm |
| 33 |
Engine life |
5 years |
| 34 |
Warranty |
1 year |
| 35 |
Plant's weight, transportation |
12 800 kg |
| 36 |
Mounting weight |
15200 kg |
| 37 |
Drum's weight А420 х 850 mm steel 1st axis |
1600 kg (Made in Japan) |
| 38 |
Drum's weight В420 х 850 mm steel 2nd axis |
1600 kg (Made in Japan) |
| 39 |
Drum's weight С273 х 850 mm silicon polymer 1st axis |
820 kg (Made in Japan) |
| 40 |
Drum's weight Д563 х 850 mm silicon polymer 2nd axis |
2130 kg (Made in Japan) |
| 41 |
Drum's weight Е420 х 850 mm steel 3rd axis |
1600 kg (Made in Japan) |
| 42 |
Drum's weight Ф237 х 850 mm silicon polymer 3rd axis |
820 kg (Made in Japan) |
| 43 |
Waranty engine life of the raw materials drums |
25000 tons of raw materials |
| 44 |
Specification of first drums of the axis |
Plaint |
| 45 |
Specification of the second drums of the axis |
Figured |
| 46 |
Rotation |
Asynchronous |
| 47 |
Removal of textile cord |
Milling, from 6 points, 3 cyclones |
| 48 |
Textile purity |
99,5% |
| 49 |
Removal of metal cord |
Outside the plant, using additional mechanisms |
| 50 |
Purity (metal) |
99,9% |
| 51 |
Transport length |
3450 mm |
| 52 |
Operating length |
4200 mm |
| 53 |
Transport width |
2780mm |
| 54 |
Operating width |
3820 mm |
| 55 |
Transportation height |
2560 mm |
| 56 |
Operating height |
4300 mm |
| 57 |
Main engine drive |
Gear drive |
| 58 |
Reducer drive |
3 units |
| 59 |
Auxiliary mechanism drive |
Belt, v-shaped |
| 60 |
Drive in the propellert of the 2nd and 3rd axes |
Gear drive |
| 61 |
Drive on separator |
Worm drive |
| 62 |
Continuous cycled feeding of raw materials |
Is to be chosen by an operator depending on raw materials |
| 63 |
Velocity ratio, rpm |
1:1.237 |
| 64 |
Speed of the frontal line of the rollers, rpm |
124. |
| 65 |
Speed of the medium line of the rollers, rpm |
237 |
| 66 |
Speed of the rear line of the rollers, rpm |
186 |
| 67 |
Amount (kg) of the fed materials/cycle |
110 kg |
| 68 |
Max distance between the rolls of the first pair |
11 mm |
| 69 |
Min distance between the rolls of the second pair |
0,3 mm |
| 70 |
Duration of the cycle |
5 min |
| 71 |
Number of workers |
1person for 5 plants |
| 72 |
Maintenance |
once/two weeks |
| 73 |
Disassembling of casing during maintenance |
5-6 hrs |
| 74 |
Production area |
25 m2 |
| 75 |
Noise |
83 dB |
| 76 |
Vibration |
No |
| 77 |
Reverse |
Yes |
| 78 |
Emergency thermal stop sensor |
Yes |
| 79 |
Foundation |
Is required |
| 80 |
Fine dust emissions |
Less than 0,0001%/hr |
| 81 |
Work specification/climate |
Indoors |
| 82 |
Transportation |
One 20ft, container |
| 83 |
Certificates |
USA, Israel, Pr China, Russia |
| 84 |
Raw materials |
Any type of rubber |
| 85 |
Start up and adjustment |
2 specialists, time -14 days. |
| 86 |
Manufacturer |
ACPEN factory |
| 87 |
Time of manufacturing |
90 days |