Writing paper (cotton) production line.
The factory consists of 10 sections
Basic production 1.Raw materials preparation section
2. Processing of plant organics (no wood is used)
3. cellulose obtaining section
4. pulp preparation section
5. Writing paper production section
6. cutting and packing section
Auxiliary sections
7. thermal unit(first it is necessary to ask powermen whether they can supply steam of 115 C, 2 tons/hr for 24 hr (including summer)
8. transforming station (it is necessary to learn whether limit of 700 kW is available for needs of the new production facilities)
9. waste disposal facilities (closed water consumtion cycle is provided for this equipment. Ordinary settling tanks will not do, purification should be made using special coagulants. Paper production requires a great amount of chemical elements to be used. Insufficient purification of water will result in sheer drop of quality to the product.
10. Interplant transport (3 electric loaders)
1.KPA-5 IN Raw materials preparation section
(placed in container)
4 auxiliary machines
Conveyors 2 units.
Control board 1 unit.
Screen 1 unit.
total power - 30 kW
productivity- 5 tons/shift
personnel- 1person/shift
Production area 40 m
small-size mechanization - 1 auto-loader or electric loader
Outdoor location is possible
Transporation - one 40 ft.conainer
2. Processing of plant organics (no wood is used) Bath for watering raw materials prior to their feeding to fiber separation unit
Bath for watering raw material fibers before theri feeding with disinfectants and bleachings
Pumps for aggressive media - 2 units
HI-1UB-I-3 Chemical purifier
LU-XR -136 thermal attrition unit
10 auxiliary units
Conveyors6 units .
Tanks 2 units
Pump 2 units, for aggressive hot media .
total power 150 kW
productivity 5 tons/shift
personnel 4 persons/shift
Production area- 100 m
small-size mechanization is not required
Can be placed in heated premises only
Transportation - one 40 ft.container.
3. Cellulose obtaining section EB-IL-81 refiner, single disk
EB-IL- 60 refiner, double disk
LU-EIJ-5\10 fine purification units
14 auiliary units
Pumps for organic mixtures 5 units.
Reagent tanks 4 units.
Electronic meter 1 units.
Conveyors4 unit.
total power 57 kW
productivity 5-10 tons/shift
personnel 1 person/shift
Production area 80 m
small-size mechanization is not required
Can be placed in heated premises only
Transporation - two 40 ft. containers
4. UUTX-B -35\4 pulp preparation section
-2 units
Pulper, 8th series -2 units
Propulsion screen, diameter - 700
Foam former, low concentration
Sand removal
Magnetic separator
19 auxiliary units
Pools 2 units.
Pulp pumps 12 units.
Sand pump 1unit.
Beater 2 units.
Suspended units 2 units
total power 120 kW
productivity 5-10 tons/shift
personnel 1 person/shift
Production area200 m
small-size mechanization is not required
Can be placed in heated premises only
Transportation 2 -40 ft.containers
5.Writing paper production section Pulp intake unit
TV-EIW- 05 paper making machine
TSV-135 EI- 1760 Drying drum (cauldron or boiler oil)
Coiling set (4 units)
8 auxiliary units
air intake unit 1 unit.
Thermal exchange mechanism 1 unit.
Moisture excess collection and pumping unit 1 unit.
Pulp return 1 unit.
Cutting machine 1unit.
Enrober 1 unit.
bushing production machine 2 units.
total power 186 kW
productivity 5 tons/shift
personnel 1 person/shift
Production area300 m
small-size mechanization- one auto-loader
Can be placed in heated premises only
Transportation - one 40 ft. container .
One oversized place on the platform
6. Cutting and packing section Recoiling set (4 machines)
Cutting presses -3 units.
15 auxiliary machines
Paper feeding and reception tables 6 units.
Dust removal system 4 units.
weighing machine 1 unit.
packing machine 1 unit.
Conveyors3 units.
blade grinding machine 1 unit.
total power 40 kW
productivity 5 - 10 tons/shift, depending on labor intensity
personnel - 5 persons/shift
Production area200 m
small-size mechanization- autoloader
Can be placed in heated premises only
Transportation - two 40ft.containers
Total power by main units - 583 kW
Auxiliary sections
7. Thermal unit (cauldron or boiler )
Steam - 2 tons/hr
Temperature 115о
Transporation - two 40 ft containers
8.Transformer
700 kW for new production line
380 V
50 Hz
Transportation - one -20 ft. container
9.Purification facilities
YW-10 machine that separates paper from water
High productivity aerator – В-250, 175 units. (with pipe line )
Biochemical bundles 225m3 (support frame including )
Fan
Dispatch device 1 unit.
box valve 1 unit.
Pressure filter xmj80/870 1 unit.
Settled water exhausting device - 3 units.
Pump for contaminating substances, 1 unit.
Metering machine - 1 unit.
Transportation two 40ft, containers
The customer should provide as follows :
Settling basin – 40m3
Pool with biochemical bundles of the first stage – 200m3
Pool with biochemical bundles of second stage – 150m3
Second settling basin – 40m3
Total power 30 kW
Weight of the whole line – 15 tons
Personnel - 5 persons
Production area 600m3
Design productivity/shift 150-200m3 water
Water indices are as follows:
COD Chemical consumption of oxygen (criterion, measure of quantity of chemical compounds in water ) – 650mg/L
SS Sterile solution – 2250 mg//L
PH – 6-8
Water temperature +10-25о
Raw Materials: flocculant (100 kg/24 hr )
Operation parameters: Both, indoors and outdoors (roof is required anyway)
10. Interplant traffinc
Тhree electric loaders or self-propelling cars, cargo capacity up to 1 tons.
Transporation - one -40 ft. container
Power by auxiliary shops 120 kW
Power limit -703 kW
|